Meyer Engineers, Ltd. has provided preliminary design services for an amphitheater facility to be constructed on a 10-acre site within the greater New Orleans area. The amphitheater will share the site with a "Festival Park." Total seating capacity desired is 6,000 -7,000 reserved seats with overflow to 10,000. Meyer is currently proceeding with design documents. Project will include the 7,000 seat amphitheater, overhead cover, stage, administration building, restroom buildings, concession stands, site paving, roads, sewerage lift station, utility lines, and landscaping.

Start Date: March 2007
Substantial Completion Date: DESIGN PHASE
Construction Cost: $15,700,000