Pump Station No. 3 Bridge (Whitney Barataria Pump Station Bridge)| Engineering Projects

harvey boulevard photoMeyer Engineers, Ltd. completed the design, construction engineering and inspection services for this project. Work included a 250-foot girder span bridge on Engineers Road (Highway 3137), an approach roadway, utility relocations, intake canal, detour road and coordination of utility adjustments for Pump Station No. 3. The bridge consisted of 70-foot pre-stressed type III concrete girder span bridges with associated sheeting, guardrails, etc. Meyer representatives completed all close out submittals and forms – and record drawings were accepted by DOTD. The project was coordinated with DOTD District 02. This project was constructed in anticipation of the Whitney Barataria Pump Station Project.

Construction Cost: $3,500,000

“It is indeed a pleasure to work with such highly qualified personnel. We hope to have future projects with Meyer Engineers, Ltd.”

Kazem Alikhani, Director
Jefferson Parish Drainage Department